NVIDIA / Grace Hopper

GH200
Specs, pricing & compute

GH200 brings a Grace CPU and Hopper GPU together through NVLink-C2C. Evaluate it for workloads that benefit from CPU–GPU data sharing and an Arm-compatible software stack.

HARDWARE REFERENCE

96 / 144 GB HBM3 / HBM3e

Grace Hopper

Exact GPU variant, CPU, RAM and interconnect depend on the confirmed instance. Memory values are hardware references, not allocated resources.

Manufacturer specifications ↗
CAPACITY

Request availability

Choose on-demand or reserved compute. Location, start time and access environment are confirmed before provisioning.

ARVICA PRICE / USD

GH200 · Arvica pricing

ON-DEMAND

View live price →

Arvica's live catalogue rate in USD per GPU-hour, for the exact configuration and current availability, locked in a signed quote before payment.

RESERVED & ENTERPRISE

Request capacity proposal →

Term, volume and dedicated-capacity prices are set in an accepted Arvica proposal. Configuration, region and delivery are confirmed in your proposal.

Availability confirmed before order acceptance. Taxes and additional services are confirmed before payment.

Choose around your workload

01

When to choose this GPU

Consider memory-intensive analytics, scientific workloads and inference pipelines that move substantial data between host and GPU. Profile transfer time separately from compute time.

02

When to consider alternatives

Compare H200 when your application requires an x86 host environment. A GH200 configuration requires validation of host-native dependencies, not just the GPU framework.

03

Memory planning

NVIDIA documents 96 GB HBM3 and 144 GB HBM3e variants. CPU memory is a separate resource; confirm both allocated capacities and the exact system variant.

04

Interconnect and scale

NVLink-C2C connects CPU and GPU within a Superchip. Multi-GPU and multi-node communication require their own confirmed topology.

05

Software compatibility

Check Arm64 container images, compiled extensions and data libraries before migration. Use a representative dataset to validate memory placement and host–device transfers.

NVIDIA hardware reference ↗ · Selection guidance is Arvica's assessment; validate it against your workload

FROM CONFIGURATION TO ACCESS

Prepare your compute environment

Operating system & containers

Specify the OS, framework and container image version. Arvica confirms the driver and GPU compatibility before activation. A template name is not a software licence or a guaranteed preinstalled image.

SSH & private access

Save an SSH public key during configuration. Keep the private key on your own device. The verified deployment record provides the actual host and login user once access is ready.

Storage & checkpoints

Separate boot disk, datasets, model weights and checkpoints in your capacity plan. Confirm persistence, backup ownership, attachment rules and deletion behaviour before relying on a volume.

Network & data location

Confirm ingress, egress, public IP access and private networking where required. For regulated or location-sensitive data, specify the required region in advanced settings before submitting.

First connection checklist

Once Arvica supplies verified access, connect using your private key and the exact host/user shown in your instance. Then inspect the allocated GPUs and topology.

ssh -i ~/.ssh/your_key USER@HOST
nvidia-smi
nvidia-smi topo -m

Replace USER and HOST with your own deployment details. These commands inspect an existing machine; they do not provision one.

Size the job before committing

Model memory

Parameter count × bytes per weight estimates weights only. Add KV cache, activations, temporary tensors and framework overhead. Training additionally needs gradients and optimiser state.

Measure useful throughput

Record model version, precision, input/output length, concurrency, latency and error rate together. Compare the cost of a completed job or successful request under the same conditions.

Complete cost

Include all allocated GPUs, runtime, storage, networking, taxes and support. Monthly projections use 730 hours for comparison; your contract defines the billable period and minimum term.

RESERVED / CLUSTERS

Need more capacity?

Define your GPU allocation, interconnect, storage, location and commitment. Arvica prepares a capacity proposal around the workload.

Request capacity ↗

Plan before benchmarking

Model fit and throughput depend on precision, software, batch size, context and system topology. Compare workload estimates rather than an unsupported tokens-per-second promise.

Training cost calculator →

FAQ

How do I choose the GPU count?

Consider memory-intensive analytics, scientific workloads and inference pipelines that move substantial data between host and GPU. Profile transfer time separately from compute time.

What should I check about memory?

NVIDIA documents 96 GB HBM3 and 144 GB HBM3e variants. CPU memory is a separate resource; confirm both allocated capacities and the exact system variant.

What software should I prepare?

Check Arm64 container images, compiled extensions and data libraries before migration. Use a representative dataset to validate memory placement and host–device transfers.

What interconnect is included?

NVLink-C2C connects CPU and GPU within a Superchip. Multi-GPU and multi-node communication require their own confirmed topology.

Can I stop billing by shutting down the operating system?

Do not assume so. Resource allocation, storage and reserved commitments may continue billing. Check the contract and request the appropriate lifecycle action through support.

Is my data retained after termination?

Retention depends on the agreed storage configuration. Export data and confirm backup and volume retention before requesting termination.

Can I deploy immediately?

Current configurations enter Arvica capacity review. Running status is shown only after infrastructure is verified.

Is the live GPU-hour price my total cost?

Not necessarily. On-demand usage is billed at Arvica's live catalogue rate; storage, network, tax and service charges are itemised before you commit, and reserved or enterprise terms are set in your proposal.

Can I use a larger cluster?

Use the enterprise capacity path for multi-node networking and reserved allocations.

Explore related GPUs

Compare before you reserve

GPUMemory referenceBest-fit decision
GH20096 / 144 GB HBM3 / HBM3eConsider memory-intensive analytics, scientific workloads and inference pipelines that move substantial data between host and GPU. Profile transfer time separately from compute time.
H10080 GB HBM3Evaluate H100 for repeatable training jobs and inference services with established CUDA kernels. Benchmark your actual sequence lengths and batch sizes before reserving a larger allocation.
H200141 GB HBM3eTest H200 when model weights, KV cache and concurrent requests compete for memory. Extra capacity can reduce the need to split a workload across GPUs, depending on precision and runtime overhead.
GB200 NVL7272-GPU systemConsider this platform for distributed training or inference that benefits from a large NVLink domain. Start with the model parallelism strategy, dataset and expected utilisation.

What changes between configurations

ConfigurationPractical differenceConfirm before ordering
Grace Hopper Superchip · Bare Metal · 96 / 144 GB HBM3 / HBM3eDedicated physical host configuration; host access follows the confirmed serviceExact card, GPU allocation, peer-to-peer connectivity, CPU and disk limits

Size the working set

Weights alone are approximately parameters × bytes per parameter. A 7B model at BF16 needs about 14 GB just for weights; a 70B model about 140 GB. Add KV cache, activations, framework buffers and training state. These are arithmetic estimates, not fit guarantees.

Measure useful performance

Compare the same model revision, precision, sequence length and concurrency. Record time to first token, p95 latency, output tokens/s, peak memory and full instance cost. Training comparisons should include step time and convergence at the same quality target.

Evidence status

Manufacturer specifications are linked below. No Arvica application-throughput benchmark is published for this configuration yet. Request a workload-specific acceptance test before making performance commitments.

NVIDIA ↗
CONFIGURATIONS · RESERVATIONS

Choose your deployment configuration

Configure dedicated PCIe / SXM, virtual-machine and bare-metal capacity with Arvica. Submit your requirements for a deployment proposal.

Request your preferred configuration. Host sizes are illustrative; the written proposal confirms capacity, location, final pricing and delivery. Submitting an enquiry is free and does not reserve capacity.

1 configurations available for enquiry

Capacity confirmation requiredBare metal

GH200 Grace Hopper Superchip

Price in your proposalYour configuration and term are priced in an Arvica proposal. Delivery schedule confirmed in proposal.

Illustrative configuration

GPU
1 × GH200
GPU memory
96 / 144 GB HBM3 / HBM3e
vCPU
16
RAM
128 GB
Storage
500 GB
AvailabilityConfirmation requiredRegionConfirm in proposalServiceArvica Cloud
Request this configuration →Check capacity and terms →
Arvica follows up on your capacity request with suitable configurations, pricing and delivery options.