GH200 brings a Grace CPU and Hopper GPU together through NVLink-C2C. Evaluate it for workloads that benefit from CPU–GPU data sharing and an Arm-compatible software stack.
Public reference / GPU-hour. Arvica sell price, taxes and additional services require an approved quote.
CAPACITY
Request availability
Choose on-demand or reserved compute. Location, start time and access environment are confirmed before provisioning.
PUBLIC PRICE REFERENCES / AUD
GH200 · Pricing references
Published source
GPU variant
Reference / GPU-hour
Price basis
No comparable published rate is currently recorded for this configuration. Request a configuration-specific quote.
Published reference rates do not establish live availability or identical instance specifications. Your Arvica quote confirms the complete configuration and charges.
Choose around your workload
01
When to choose this GPU
Consider memory-intensive analytics, scientific workloads and inference pipelines that move substantial data between host and GPU. Profile transfer time separately from compute time.
02
When to consider alternatives
Compare H200 when your application requires an x86 host environment. A GH200 configuration requires validation of host-native dependencies, not just the GPU framework.
03
Memory planning
NVIDIA documents 96 GB HBM3 and 144 GB HBM3e variants. CPU memory is a separate resource; confirm both allocated capacities and the exact system variant.
04
Interconnect and scale
NVLink-C2C connects CPU and GPU within a Superchip. Multi-GPU and multi-node communication require their own confirmed topology.
05
Software compatibility
Check Arm64 container images, compiled extensions and data libraries before migration. Use a representative dataset to validate memory placement and host–device transfers.
Specify the OS, framework and container image version. Arvica confirms the driver and GPU compatibility before activation. A template name is not a software licence or a guaranteed preinstalled image.
SSH & private access
Save an SSH public key during configuration. Keep the private key on your own device. The verified deployment record provides the actual host and login user once access is ready.
Storage & checkpoints
Separate boot disk, datasets, model weights and checkpoints in your capacity plan. Confirm persistence, backup ownership, attachment rules and deletion behaviour before relying on a volume.
Network & data location
Confirm ingress, egress, public IP access and private networking where required. For regulated or location-sensitive data, specify the required region in advanced settings before submitting.
First connection checklist
Once Arvica supplies verified access, connect using your private key and the exact host/user shown in your instance. Then inspect the allocated GPUs and topology.
Replace USER and HOST with your own deployment details. These commands inspect an existing machine; they do not provision one.
Size the job before committing
Model memory
Parameter count × bytes per weight estimates weights only. Add KV cache, activations, temporary tensors and framework overhead. Training additionally needs gradients and optimiser state.
Measure useful throughput
Record model version, precision, input/output length, concurrency, latency and error rate together. Compare the cost of a completed job or successful request under the same conditions.
Complete cost
Include all allocated GPUs, runtime, storage, networking, taxes and support. Monthly projections use 730 hours for comparison; your contract defines the billable period and minimum term.
Model fit and throughput depend on precision, software, batch size, context and system topology. Compare workload estimates rather than an unsupported tokens-per-second promise.
Consider memory-intensive analytics, scientific workloads and inference pipelines that move substantial data between host and GPU. Profile transfer time separately from compute time.
What should I check about memory?
NVIDIA documents 96 GB HBM3 and 144 GB HBM3e variants. CPU memory is a separate resource; confirm both allocated capacities and the exact system variant.
What software should I prepare?
Check Arm64 container images, compiled extensions and data libraries before migration. Use a representative dataset to validate memory placement and host–device transfers.
What interconnect is included?
NVLink-C2C connects CPU and GPU within a Superchip. Multi-GPU and multi-node communication require their own confirmed topology.
Can I stop billing by shutting down the operating system?
Do not assume so. Resource allocation, storage and reserved commitments may continue billing. Check the contract and request the appropriate lifecycle action through support.
Is my data retained after termination?
Retention depends on the agreed storage configuration. Export data and confirm backup and volume retention before requesting termination.
Can I deploy immediately?
Current configurations enter Arvica capacity review. Running status is shown only after infrastructure is verified.
Is the reference price my final bill?
No. Your quote defines GPU, storage, network, tax and service charges before you commit.
Can I use a larger cluster?
Use the enterprise capacity path for multi-node networking and reserved allocations.
Explore PCIe / SXM and virtual machine / bare-metal configurations. Reserve with Arvica before activation.
Showcase & pre-order enquiry — checkout is not enabled. Host sizes are illustrative; stock, regions and final pricing require confirmation. Submitting a request does not reserve capacity or charge your card.
B300 Blackwell Ultra
Pre-orders open · 6 weeks ready
Target lead time from order and capacity confirmation. Your confirmed order specifies the delivery date.
Automated deployment, metering, CPU and Spot purchasing are being integrated. Availability enquiries are followed up by the Arvica team; automated stock alerts are not active.