NVIDIA / Ada Lovelace

RTX 4090
Specs, pricing & compute

RTX 4090 provides Ada Lovelace compute with 24 GB GDDR6X. It is a candidate for development, image generation and memory-bounded inference experiments.

HARDWARE REFERENCE

24 GB GDDR6X

Ada Lovelace

Exact GPU variant, CPU, RAM and interconnect depend on the confirmed instance. Memory values are hardware references, not allocated resources.

Manufacturer specifications
PRICING STATE

A$ 0.48

Public reference / GPU-hour. Arvica sell price, taxes and additional services require an approved quote.

Reference price source
CAPACITY

Request availability

Choose on-demand or reserved compute. Location, start time and access environment are confirmed before provisioning.

PUBLIC PRICE REFERENCES / AUD

RTX 4090 · Pricing references

Published sourceGPU variantReference / GPU-hourPrice basis
TensorDockRTX 4090 · 24 GBA$ 0.48host-starting

Published reference rates do not establish live availability or identical instance specifications. Your Arvica quote confirms the complete configuration and charges.

Choose around your workload

01

When to choose this GPU

Evaluate tasks whose weights, activations and caches fit within one GPU. For experiments, compare completed-job cost and reproducibility across available configurations.

02

When to consider alternatives

Consider RTX 5090 for more memory and a Blackwell software path. For 48 GB workloads, compare RTX 6000 Ada and L40S before increasing GPU count.

03

Memory planning

The standard RTX 4090 has 24 GB GDDR6X. Model size alone does not account for batch size, attention cache and intermediate allocations.

04

Interconnect and scale

Confirm the server's PCIe and networking layout for multiple GPUs. Separate graphics capability from any promised multi-node training capability.

05

Software compatibility

Check Ada-compatible drivers and containers, plus application licensing. Request the exact OS and isolation configuration needed for your workflow.

NVIDIA hardware reference · Selection guidance is Arvica's assessment; validate it against your workload

FROM CONFIGURATION TO ACCESS

Prepare your compute environment

Operating system & containers

Specify the OS, framework and container image version. Arvica confirms the driver and GPU compatibility before activation. A template name is not a software licence or a guaranteed preinstalled image.

SSH & private access

Save an SSH public key during configuration. Keep the private key on your own device. The verified deployment record provides the actual host and login user once access is ready.

Storage & checkpoints

Separate boot disk, datasets, model weights and checkpoints in your capacity plan. Confirm persistence, backup ownership, attachment rules and deletion behaviour before relying on a volume.

Network & data location

Confirm ingress, egress, public IP access and private networking where required. For regulated or location-sensitive data, specify the required region in advanced settings before submitting.

First connection checklist

Once Arvica supplies verified access, connect using your private key and the exact host/user shown in your instance. Then inspect the allocated GPUs and topology.

ssh -i ~/.ssh/your_key USER@HOST
nvidia-smi
nvidia-smi topo -m

Replace USER and HOST with your own deployment details. These commands inspect an existing machine; they do not provision one.

Size the job before committing

Model memory

Parameter count × bytes per weight estimates weights only. Add KV cache, activations, temporary tensors and framework overhead. Training additionally needs gradients and optimiser state.

Measure useful throughput

Record model version, precision, input/output length, concurrency, latency and error rate together. Compare the cost of a completed job or successful request under the same conditions.

Complete cost

Include all allocated GPUs, runtime, storage, networking, taxes and support. Monthly projections use 730 hours for comparison; your contract defines the billable period and minimum term.

RESERVED / CLUSTERS

Need more capacity?

Define your GPU allocation, interconnect, storage, location and commitment. Arvica prepares a capacity proposal around the workload.

Request capacity

Plan before benchmarking

Model fit and throughput depend on precision, software, batch size, context and system topology. Compare workload estimates rather than an unsupported tokens-per-second promise.

Training cost calculator

FAQ

How do I choose the GPU count?

Evaluate tasks whose weights, activations and caches fit within one GPU. For experiments, compare completed-job cost and reproducibility across available configurations.

What should I check about memory?

The standard RTX 4090 has 24 GB GDDR6X. Model size alone does not account for batch size, attention cache and intermediate allocations.

What software should I prepare?

Check Ada-compatible drivers and containers, plus application licensing. Request the exact OS and isolation configuration needed for your workflow.

What interconnect is included?

Confirm the server's PCIe and networking layout for multiple GPUs. Separate graphics capability from any promised multi-node training capability.

Can I stop billing by shutting down the operating system?

Do not assume so. Resource allocation, storage and reserved commitments may continue billing. Check the contract and request the appropriate lifecycle action through support.

Is my data retained after termination?

Retention depends on the agreed storage configuration. Export data and confirm backup and volume retention before requesting termination.

Can I deploy immediately?

Current configurations enter Arvica capacity review. Running status is shown only after infrastructure is verified.

Is the reference price my final bill?

No. Your quote defines GPU, storage, network, tax and service charges before you commit.

Can I use a larger cluster?

Use the enterprise capacity path for multi-node networking and reserved allocations.

Explore related GPUs

CONFIGURATIONS · RESERVATIONS

Choose your deployment configuration

Explore PCIe / SXM and virtual machine / bare-metal configurations. Reserve with Arvica before activation.

Showcase & pre-order enquiry — checkout is not enabled. Host sizes are illustrative; stock, regions and final pricing require confirmation. Submitting a request does not reserve capacity or charge your card.
B300 Blackwell Ultra

Pre-orders open · 6 weeks ready

Target lead time from order and capacity confirmation. Your confirmed order specifies the delivery date.

Reserve B300

2 configurations for enquiry

Pre-order requiredVirtual machine

RTX 4090 PCIe

Request AUD pricingDelivery to be confirmed

Illustrative configuration

GPU
1 × RTX 4090
GPU memory
24 GB GDDR6X
vCPU
16
RAM
128 GB
Storage
500 GB
AvailabilityConfirmation requiredRegionConfirm with your orderServiceArvica Cloud
Request reservation Ask about future availability
Pre-order requiredBare metal

RTX 4090 PCIe

Request AUD pricingDelivery to be confirmed

Illustrative configuration

GPU
1 × RTX 4090
GPU memory
24 GB GDDR6X
vCPU
16
RAM
128 GB
Storage
500 GB
AvailabilityConfirmation requiredRegionConfirm with your orderServiceArvica Cloud
Request reservation Ask about future availability
Automated deployment, metering, CPU and Spot purchasing are being integrated. Availability enquiries are followed up by the Arvica team; automated stock alerts are not active.