ARVICA CLOUD / FUTURE CAPACITY
RUBIN RESERVATIONS OPEN

NVIDIA Vera Rubin.

The next generation of AI compute, planned for your next breakthrough.

Arvica has confirmed NVIDIA Vera Rubin NVL72 rack and HGX Rubin NVL8 server hardware delivery for October–December 2027. The equipment is planned for Swanbank, Ipswich, Queensland, with customer service targeted for early 2028. Reservations are open; 12-month minimum term, deposit and security bond apply.

Last updated: 23 November 2026

Enquiry only. This request creates no payment or confirmed allocation. Delivery dates require a separate written agreement.

Original 3D concept of a dense AI compute rack with network equipment and liquid cooling
3D concept visual for illustrative purposes.
Q4 2027Confirmed hardware delivery
72Rubin GPUs / NVL72 reference rack
36Vera CPUs / reference rack
NVLink 6NVIDIA reference architecture
01 / PLATFORM

Architected for the next wave of AI.

Vera Rubin brings accelerated computing, memory and high-speed interconnect into a tightly integrated rack-scale architecture. Arvica can scope the infrastructure you need, then confirm a deliverable configuration in a written proposal.

Rack-scale compute

Reference architecture: NVIDIA Vera Rubin NVL72 with 72 Rubin GPUs and 36 Vera CPUs.

High-speed fabric

Built around NVLink 6; networking, storage and tenancy are scoped for your workload.

Procurement clarity

Region, capacity, cooling, service terms and delivery milestones are confirmed before any commitment.

Architecture information is based on NVIDIA's published platform materials, not an Arvica inventory claim. Official NVIDIA specification

02 / CAPACITY PLANNING

Choose how you want to scale.

Start with an indicative topology. Final models, rack counts, location and commercial terms are reviewed case by case.

02ENTERPRISE CLUSTERS

Multi-rack planning

Discuss a multi-rack design with fabric, storage, resiliency and deployment milestones defined.

Discuss multi-rack capacity
03HGX RUBIN NVL8 / CUSTOM

Dedicated 8-GPU Rubin server

Reserve an HGX Rubin NVL8 eight-GPU server, or discuss a different configuration. Hardware arrives Q4 2027 and service targets early 2028.

Request HGX NVL8 capacity Custom architecture
Original 3D concept of a multi-rack AI factory and shared liquid cooling
3D concept visual for illustrative purposes.
03 / DEPLOYMENT PATH

Plan ahead. Deploy with clarity.

Arvica confirms Q4 2027 delivery for NVL72 and HGX NVL8 hardware. Customer service is targeted for early 2028, subject to the planned Swanbank facility commissioning; a backup Australian data centre can be used if Swanbank is delayed.

  1. 01
    Tell us your workload

    GPU scale, region, term, networking, storage and start window.

  2. 02
    Receive a proposed configuration

    We evaluate architecture, supplier pathway and indicative delivery milestones.

  3. 03
    Confirm terms in writing

    Allocation, price, host location and obligations are agreed before any binding reservation.

  4. 04
    Hardware Q4 2027; service early 2028

    Hardware delivery is confirmed; commissioning, site, networking and written acceptance determine the customer service start.

04 / QUESTIONS

The details that matter.

Is NVIDIA Vera Rubin available from Arvica now?

Not for immediate use. NVL72 and HGX NVL8 hardware delivery is confirmed for Q4 2027, with Australian customer service targeted for early 2028.

Which Rubin configurations can I reserve?

Vera Rubin NVL72 rack-scale systems (72 GPUs per rack) and HGX Rubin NVL8 servers (8 GPUs per server).

Where will the hardware be hosted?

At Arvica's planned liquid-cooled facility in Swanbank, Ipswich, Queensland. The facility is not yet operational, and hardware and customer data will remain in Australia.

How do I reserve Rubin capacity?

Submit your configuration and term for a written quote. The enquiry is non-binding; capacity is held after the contract is signed and the required deposit and security bond are paid.

What is the minimum rental term?

12 months, with longer terms available. Pricing, deposit and security bond are quoted per configuration.

What happens if Swanbank is delayed?

Arvica has a backup Australian data centre. Reserved Rubin hardware can be deployed there instead, with the alternative site and start date confirmed in writing.

FUTURE CAPACITY / EARLY ENQUIRIES OPEN

Reserve your 2028 Australian AI capacity.

Specify NVL72 or HGX NVL8, your fabric and workload, and a 12-month or longer term. We will issue a written configuration and reservation quote.

Request Rubin capacity