GB300 NVL72 Hosting Requirements: A Site-Readiness Checklist
A buyer's checklist for an exact OEM rack: site preparation, power, liquid and air cooling, network, commissioning and ownership boundaries.
· Arvica Cloud · Site-readiness checklist
Treat NVL72 as one rack-scale system
NVIDIA's GB300 NVL72 architecture describes 72 Blackwell Ultra GPUs, 36 Grace CPUs, liquid cooling, NVLink switch trays, power shelves and leak detection. A hosting decision concerns the integrated rack and supporting systems, not 72 independent GPU slots. Confirm the exact OEM revision and delivery configuration before assessing a facility. [1]
Obtain the site-preparation pack
Request the rack bill of materials, dimensions, loaded and shipping weights, floor loading, delivery route, rigging plan, service clearance, power-feed diagram, cooling envelope, residual air heat and cable schedule. NVIDIA's DGX GB guide shows compute trays, switch trays, busbar, power shelves and manifolds within the rack. A generic high-density rack allowance or concept image cannot replace this pack. [2]
Engineer the exact power envelope
Validate steady-state and peak input, feeds, protection, redundancy, power quality, isolation and metering for the actual rack and any external storage or edge devices. Agree on a witnessed commissioning test. NVIDIA documents different power figures in different GB rack references and configurations; neither is an Arvica rack-support or grid-approval claim. Use the signed OEM site-preparation sheet and facility engineer's design as the contractual basis. [1][2]
Specify liquid and residual air cooling
NVIDIA describes liquid-cooled CPU and GPU cold plates, rack manifolds and air-cooled components in its DGX GB system. Obtain OEM-approved coolant chemistry, supply and return temperature, flow, pressure, CDU location, filtration, leak-response limits and residual air requirements. The Open Compute Project distinguishes the technology cooling loop from the facility water loop; name the owner of each side and test both under a representative workload. [2][3]
Plan every network and management path
Separate east-west compute fabric, north-south customer and storage links, and out-of-band management. Obtain the actual port and cable map, optical transceivers, routing, tenant isolation, storage design, telemetry and failure domains. The NVIDIA reference design illustrates these paths but does not make a particular InfiniBand or Ethernet speed part of an Arvica proposal. [1]
Define commissioning and operating ownership
Agree in writing who receives and installs the rack, fills and tests coolant, signs off leak detection, controls power-on, brings up the network, maintains firmware, supplies spares and responds to incidents. Define acceptance evidence and remedies if a stage fails. NVIDIA's deployment checklist covers rack, power, cooling and network validation; adapt it to the purchased system and contract. [4]
Arvica's planning status and next step
Arvica is planning a high-density, liquid-cooled AI data centre in Swanbank, Queensland, targeting approximately 2.2 MW of IT capacity, subject to grid connection, engineering design, regulatory approvals and customer demand. Expressions of interest are open for enterprise GPU colocation and dedicated AI infrastructure. The facility is planned, not operational. This target is not an approved power allocation or a promise that a particular GB300 rack can be hosted; send the OEM pack through the existing non-binding EOI.
Frequently asked questions
Does a 2.2 MW IT target prove GB300 rack readiness?
No. A facility-wide planning target does not validate the rack's electrical, cooling, network or approval status.
Which GB300 power number should I use?
Use the exact OEM SKU, site-preparation sheet and engineer-approved load definition. NVIDIA reference documents describe different configurations; do not substitute one published figure for a contracted envelope. [1][2]
Is an EOI a rack reservation?
No. It opens technical and commercial review. Site readiness, rack fit and any allocation require later written confirmation.
Download an editable worksheet to agree scope, compare configurations and decide whether to stop, adjust or scale. An evaluation method, not a customer case study.
Compare scope, allocation, storage, networking and pilot acceptance before committing to a B300 node. Includes a worked cost formula, not a supplier price.
Build a representative inference test with model, precision, context, concurrency and quality targets. Connect the measured result to a transparent GPU budget.